Altuwaim, A and El-Rayes, K (2018) Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost. Journal of Construction Engineering and Management, 144(07).

Hasanzadeh, S, Esmaeili, B and Dodd, M D (2018) Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking. Journal of Construction Engineering and Management, 144(07).

Hosseini, M R, Martek, I, Chileshe, N, Zavadskas, E K and Arashpour, M (2018) Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective. Journal of Construction Engineering and Management, 144(07).

Hwang, S, Jebelli, H, Choi, B, Choi, M and Lee, S (2018) Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG. Journal of Construction Engineering and Management, 144(07).

Jordan Srour, F, Kiomjian, D and Srour, I M (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management, 144(07).

Karakhan, A A, Rajendran, S, Gambatese, J and Nnaji, C (2018) Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach. Journal of Construction Engineering and Management, 144(07).

Karimi, H, Taylor, T R B, Dadi, G B, Goodrum, P M and Srinivasan, C (2018) Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(07).

Konstantinou, E and Brilakis, I (2018) Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site. Journal of Construction Engineering and Management, 144(07).

Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).

Liu, J and Lu, M (2018) Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Journal of Construction Engineering and Management, 144(07).

  • Type: Journal Article
  • Keywords: Project planning; Project control; Constraint programming; Material information management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001507
  • Abstract:
    With increasing implementation of off-site prefabrication and modular construction technologies, the complexity of material supply chain management on construction projects has grown substantially. However, research on construction scheduling has yet to take dynamic material logistics as an explicit constraint in analytically deriving construction schedules and addressing impacts of uncertainties in material supply on project budget. This study proposes a two-step analytical approach to tackle the identified problem. First, a constraint programming-based scheduling optimization model is developed to derive project schedules subject to variable material delivery times and finite crew resource availability. The second step is to take advantage of the valid optimization model for evaluating the impact of different input settings of material logistics on project budget. An example project adapted from the literature is used to illustrate the effectiveness of the proposed optimization model in coping with variable material delivery times. Based on the same case, the delivery date of a particular material is singled out as the risk factor of interest in order to derive the complex relationship between material delivery date and total project cost. In addition, a case study based on a bridge girder fabrication project is presented to demonstrate the applicability of the proposed optimization model on projects of practical size. In conclusion, this study adds to the body of knowledge by developing an analytical methodology that factors material supply constraints into the resource-constrained scheduling optimization model so as to analyze the impact of uncertainties in material deliveries on project budget.

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission. Journal of Construction Engineering and Management, 144(07).

Mirzaei, A, Nasirzadeh, F, Parchami Jalal, M and Zamani, Y (2018) 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Journal of Construction Engineering and Management, 144(07).

Sankaran, B and O’Brien, W J (2018) Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Journal of Construction Engineering and Management, 144(07).

Swei, O (2018) Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management, 144(07).

Trinh, M T, Feng, Y and Jin, X (2018) Conceptual Model for Developing Resilient Safety Culture in the Construction Environment. Journal of Construction Engineering and Management, 144(07).